In the picturesque Rathausviertel neighborhood of Kirchheim bei Muenchen, an impressive development is taking shape. A modern residential quarter with 138 apartments and 28 townhouses is under construction here which not only offers future residents an attractive home, but also makes a sustainable contribution to environmental protection. How? By recycling the gravel generated during excavation pit construction and reusing it to produce concrete. Within a period of just eight weeks, the Bauer Resources team gradually excavated the excavation pits up to a depth of 3 m. In the process, a total of 38,000 m3 of material was produced, including roughly 33,000 m3 of gravel. This was loaded directly, transported to a nearby gravel plant and treated there for concrete production. It’s that easy, it’s that sustainable.
BAUER Resources GmbH, Bauer Umwelt Division
Heimstettner Straße, 85551 Kirchheim bei Muenchen
May to June 2022
Excavation pits
The excavation pit of the future
Time for the next project?
Get in touch with us.